Higher is Better
- June 14, 2018
- Posted by: Jill Rhodes
- Category: Uncategorized, Widening
No Comments

The current bridges over 9 Mile Road has a vertical clearance of 15 feet. To accommodate the increase in over-sized loads traveling through this area, the new, single bridge will have a vertical clearance of 18 feet, 10.5 inches. As always please watch for our crews working to make our highways safer.